C&D contribution to total UK Waste

65

C&D waste processed annually by Day Aggregates

300000

Recycled aggregates we’ve sold since 2023

1400000

Waste to Resource

Construction and Demolition (C&D) waste arises from a wide range of activities, including demolition, site clearance, excavation, and refurbishment.

Materials such as concrete, brick, asphalt, and soils are collected and transported to our recycling facilities, where they are assessed and processed under controlled conditions.

Our approach focuses on extracting maximum value from every load received. This allows us to return materials to productive use, supporting a more circular construction model.

Materials are:

  • Inspected and sorted to remove contaminants
  • Crushed and screened to required sizes
  • Processed into certified recycled aggregates
Decorative image

Quality-Controlled Processing

Maintaining consistency is central to our recycling operations. By controlling incoming material streams and applying robust processing methods, we ensure our recycled products meet industry requirements and perform reliably on site.

All our recycling plant sites are graded as Band A Operators by the Environment Agency.

Sustainable Material Choice

Processing C&D waste into reusable aggregates delivers clear environmental benefits.
This supports meeting sustainability targets while maintaining performance on site.

Reduces the need for primary extraction

Diverts materials away from landfill

Lowers the carbon impact associated with sourcing and transporting primary aggregates